© InterEnergy. All rights reserved.
Generation: Solar
Start of operation: 2017
Installed capacity: 52 MWp
Location: Kennedy 4700, Of. 901. Patio Kennedy Building, Vitacura, Santiago 7630454, Chile
All of these projects fall under the 9 MW level and benefit from Chile’s PMGD regime which grants beneficial connection arrangements to the distribution system and the option to choose different energy price mechanisms. The main advantage of PMGD projects is that they have priority of dispatch to the network over non-PMGD generators.