{"id":10792,"date":"2021-08-03T11:32:51","date_gmt":"2021-08-03T11:32:51","guid":{"rendered":"https:\/\/interenergy.com\/donde-estamos\/"},"modified":"2025-08-05T21:29:17","modified_gmt":"2025-08-05T21:29:17","slug":"donde-estamos","status":"publish","type":"page","link":"https:\/\/interenergy.com\/es\/donde-estamos\/","title":{"rendered":"D\u00f3nde estamos"},"content":{"rendered":"<p><img decoding=\"async\" src=\"\/wp-content\/uploads\/2023\/07\/iconos-new-01w.svg\" alt=\"\"><\/p>\n<h1>D\u00f3nde estamos<br class=\"uk-visible@s\"><\/h1>\n<div>\n<p>Durante m\u00e1s de treinta a\u00f1os, InterEnergy ha impulsado a las personas y ciudades en el Caribe y Am\u00e9rica Latina, brindando energ\u00eda confiable, rentable y limpia, y ha implementado la plataforma m\u00e1s sofisticada para estaciones de carga de veh\u00edculos el\u00e9ctricos en el Caribe y Am\u00e9rica Latina.<\/p>\n<\/div>\n<hr>\n<h2><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/interenergy.com\/wp-content\/uploads\/2023\/04\/pin-15.svg\" alt=\"\" class=\"alignnone wp-image-1885\" width=\"40\" height=\"40\" \/> Oficinas &nbsp;&nbsp;<img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/interenergy.com\/wp-content\/uploads\/2023\/04\/pin-13.svg\" alt=\"\" class=\"alignnone wp-image-1885\" width=\"40\" height=\"40\" \/> Operaciones<\/h2>\n<ul>\n<li>\n<p>17.940206,-77.692292<\/p>\n<h3>BMR WIND<\/h3>\n<div>\n<p><strong>Address<\/strong>: <span>BMR WIND, Jamaica<\/span>, <span>USVI<\/span><br \/><strong>Installed Capacity<\/strong>: 36.3 MW<strong><br \/><\/strong><strong>Generation:<\/strong> Solar<\/p>\n<\/div>\n<\/li>\n<li>\n<p>18.342849,-64.900833<\/p>\n<h3>DONOE (St.Thomas)<\/h3>\n<div>\n<p><strong>Address<\/strong>: <span>DONOE (St.Thomas), USVI<\/span>, <span>Cayman<\/span><br \/><strong>Installed Capacity<\/strong>: 4.8 MW<strong><br \/><\/strong><strong>Generation:<\/strong> Solar<\/p>\n<\/div>\n<\/li>\n<li>\n<p>19.290172,-81.245472<\/p>\n<h3>BODDEN TOWN<\/h3>\n<div>\n<p><strong>Address<\/strong>: <span>BODDEN TOWN<\/span>, <span>Cayman<\/span><br \/><strong>Installed Capacity<\/strong>: 5.1 MW<strong><br \/><\/strong><strong>Generation:<\/strong> Solar<\/p>\n<\/div>\n<\/li>\n<li>\n<p>17.717992,-64.775375<\/p>\n<h3>SPANISH TOWN (St. Croix)<\/h3>\n<div>\n<p><strong>Address<\/strong>: <span>SPANISH TOWN (St. Croix)<\/span>, <span>USVI<\/span><br \/><strong>Installed Capacity<\/strong>: 5.1 MW<strong><br \/><\/strong><strong>Generation:<\/strong> Solar<\/p>\n<\/div>\n<\/li>\n<li>\n<p>14.975263840535332,-89.65056135581942<\/p>\n<h3>SIBO Solar Plant<\/h3>\n<div>\n<p><strong>Address<\/strong>: SIBO Guatemala<br \/><strong>Installed Capacity<\/strong>: 5.8 MW<strong><br \/><\/strong><strong>Generation:<\/strong> Solar<\/p>\n<\/div>\n<\/li>\n<li>\n<p>8.986305721888474,-79.5179140696206<\/p>\n<h3>Panama Office<\/h3>\n<div>\n<p><strong>Address:<\/strong> Obarrio, 58 East Street, Plaza 58 Building, 9th Floor<\/p>\n<\/div>\n<\/li>\n<li>\n<p>18.4596405,-69.9287329<\/p>\n<h3>CEPM &#038; Energas<\/h3>\n<div>\n<p><strong>Office\u2019s address<\/strong>: Ave. Abraham Lincoln 295, Edif. Caribalico, 3rd floor, La Julia, Sto. Dgo, D.N.<\/p>\n<\/div>\n<\/li>\n<li>\n<p>-33.4026068,-70.5860826<\/p>\n<h3>Solar Chile<\/h3>\n<div>\n<p><strong>Office\u2019s address<\/strong>: Kennedy 4700, Of. 901. Patio Kennedy Building, Vitacura, Santiago 7630454, Chile<\/p>\n<p><strong>Installed Capacity<\/strong>: 45MW<\/p>\n<p><strong>Generation:<\/strong> Solar<\/p>\n<\/div>\n<\/li>\n<li>\n<p>17.864887,-71.304187<\/p>\n<h3>Quilvio Cabrera<\/h3>\n<div>\n<p><strong>Operations address<\/strong>: Juancho, Pedernales Province.<\/p>\n<p><strong>Installed Capacity<\/strong>: 8.25 MW<\/p>\n<p><strong>Generation:<\/strong>: Wind<\/p>\n<\/div>\n<\/li>\n<li>\n<p>18.264439601552752,-70.49089168729525<\/p>\n<h3>GEDOM<\/h3>\n<div>\n<p><strong>Operations address<\/strong>: Sabana Buey, Peravia Province.<\/p>\n<p><strong>Installed Capacity<\/strong>: 34MW expandable to 50MW<\/p>\n<p><strong>Generation: <\/strong>Wind<\/p>\n<\/div>\n<\/li>\n<li>\n<p>18.6109199,-69.4645029<\/p>\n<h3>Energas<\/h3>\n<div>\n<p><strong>Operations address<\/strong>: San Pedro de Macor\u00eds Province, 21000.<\/p>\n<p><strong>Office\u2019s address<\/strong>: Ave. Abraham Lincoln 295, Edif. Caribalico, 3rd floor, La Julia, Sto. Dgo, D.N.<\/p>\n<p><strong>Installed Capacity<\/strong>: 300 MW<\/p>\n<p><strong>Generation<\/strong>: Combined-cycle Natural Gas<\/p>\n<\/div>\n<\/li>\n<li>\n<p>18.66387936293568,-68.43344185981745<\/p>\n<h3>CEPM<\/h3>\n<div>\n<p><strong>Operations address:<\/strong> East Tourist Boulevard, Bavaro, La Altagracia Province, R. D.<\/p>\n<p><strong>Installed Capacity:<\/strong> 315MW<\/p>\n<p><strong>HFO\/Natural gas\/Thermal\/Solar<\/strong><\/p>\n<p><strong>Generation:<\/strong> Mixed (gas, solar, wind and HFO)<\/p>\n<\/div>\n<\/li>\n<li>\n<p>17.896750,-77.106209<\/p>\n<p><img decoding=\"async\" src=\"\/wp-content\/uploads\/2023\/04\/galeria-jamaica_0004_Layer-2.jpg\" alt=\"\"><\/p>\n<h3>Doctor Bird Power Station (DBPS)<\/h3>\n<div>\n<p><strong>Address<\/strong>: Old Harbour Bay, St. Catherine, Jamaica, W.I.<br \/><strong>Installed Capacity<\/strong>: 124 MW<br \/><strong>HFO<br \/><\/strong><strong>Generation:<\/strong> Standalone electric utility<\/p>\n<\/div>\n<\/li>\n<li>\n<p>17.972404,-76.805678<\/p>\n<p><img decoding=\"async\" src=\"\/wp-content\/uploads\/2023\/04\/galeria-jamaica_0001_Layer-5.jpg\" alt=\"\"><\/p>\n<h3>West Kingston Power Partners (WKPP) and Jamaica Energy Partners Group HQ (JEP)<\/h3>\n<div>\n<p><strong>Address:<\/strong> Wikip Place, Marcus Garvey Drive, Kingston, Jamaica, W.I.<\/p>\n<p><strong>Installed Capacity:<\/strong> 65.5 MW<\/p>\n<p><strong>HFO<\/strong><\/p>\n<p><strong>Generation:<\/strong> Standalone electric utility<\/p>\n<\/div>\n<\/li>\n<li>\n<p>17.972404,-76.805678<\/p>\n<p><img decoding=\"async\" src=\"\/wp-content\/uploads\/2023\/04\/galeria-jamaica_0003_Layer-3.jpg\" alt=\"\"><\/p>\n<h3>Jamaica Private Power Company (JPPC)<\/h3>\n<div>\n<p><strong>Address:<\/strong> 100 Windward Road, Kingston 2, Jamaica, W.I., Post Office Box 8259 (C.S.O.)<br \/><strong>Installed Capacity:<\/strong> 60 MW<br \/><strong>HFO<br \/><\/strong><strong>Generation:<\/strong> Standalone electric utility<\/p>\n<\/div>\n<\/li>\n<li>\n<p>8.1680,-80.5408<\/p>\n<h3>Laudato S\u00ed<\/h3>\n<div>\n<p><strong>Operation address:<\/strong> E\u00f3lico Penonom\u00e9 Project, Penonom\u00e9<br \/>(Cocl\u00e9 Province)<\/p>\n<p><strong>Installed Capacity:<\/strong> 215 MW<\/p>\n<p><strong>Generation: <\/strong>Wind<\/p>\n<\/div>\n<\/li>\n<li>\n<p>8.376652,-82.345875<\/p>\n<h3>Ikakos (Tecnisol)<\/h3>\n<div>\n<p><strong>Operations address:<\/strong> Finca Hicaco in David (Chiriqu\u00ed Province)<\/p>\n<p><strong>Installed Capacity:<\/strong> 40MW<\/p>\n<p><strong>Generation:<\/strong> Solar<\/p>\n<\/div>\n<\/li>\n<li>\n<p>9.328376,-79.907764<\/p>\n<h3>Gat\u00fan<\/h3>\n<div>\n<p><strong>Operations address:<\/strong> Telfers Island, Crist\u00f3bal (Col\u00f3n Province)<\/p>\n<p><strong>Capacity in Development: <\/strong>670 MW<strong><br \/><\/strong><\/p>\n<p><strong>Generation: <\/strong>Natural gas<\/p>\n<\/div>\n<\/li>\n<li>\n<p>-30.507217,-71.111958<\/p>\n<h3>El Olivo<\/h3>\n<div>\n<p><strong>Operations address:<\/strong> Camino D-489 \u2013 P.K. 4,200<\/p>\n<p><strong>Installed Capacity:<\/strong> 2.95 MW<\/p>\n<p><strong>Generation:<\/strong> Solar<\/p>\n<\/div>\n<\/li>\n<li>\n<p>-30.554872,-71.238839<\/p>\n<h3>Alturas de Ovalle<\/h3>\n<div>\n<p><strong>Operations address:<\/strong> Camino D-525 \u2013 P.K. 3,500<\/p>\n<p><strong>Installed Capacity:<\/strong> 6 MW<\/p>\n<p><strong>Generation:<\/strong> Solar<\/p>\n<\/div>\n<\/li>\n<li>\n<p>-30.554872,-71.238839<\/p>\n<h3>Cabilsol<\/h3>\n<div>\n<p><strong>Operations address:<\/strong> Ruta E-35<\/p>\n<p><strong>Installed Capacity:<\/strong> 3 MW<\/p>\n<p><strong>Generation:<\/strong> Solar<\/p>\n<\/div>\n<\/li>\n<li>\n<p>-32.777144,-70.813306<\/p>\n<h3>Panquehue<\/h3>\n<div>\n<p><strong>Operations address:<\/strong> Ruta CH60<\/p>\n<p><strong>Installed Capacity:<\/strong> 6 MW<\/p>\n<p><strong>Generation:<\/strong> Solar<\/p>\n<\/div>\n<\/li>\n<li>\n<p>-32.777144,-70.813306<\/p>\n<h3>Chimbarongo<\/h3>\n<div>\n<p><strong>Operations address:<\/strong> Ruta I-85-J<\/p>\n<p><strong>Installed Capacity:<\/strong> 2.995 MW<\/p>\n<p><strong>Generation:<\/strong> Solar<\/p>\n<\/div>\n<\/li>\n<li>\n<p>-34.264753,-71.385908<\/p>\n<h3>Don Eugenio<\/h3>\n<div>\n<p><strong>Operations address:<\/strong> Ruta H-790<\/p>\n<p><strong>Installed Capacity:<\/strong> 3 MW<\/p>\n<p><strong>Generation:<\/strong> Solar<\/p>\n<\/div>\n<\/li>\n<li>\n<p>-33.902094,-71.441364<\/p>\n<h3>San Pedro<\/h3>\n<div>\n<p><strong>Operations address:<\/strong> Ruta 66 \u2013 P.K. 1,100<\/p>\n<p><strong>Installed Capacity:<\/strong> 3 MW<\/p>\n<p><strong>Generation:<\/strong> Solar<\/p>\n<\/div>\n<\/li>\n<li>\n<p>-34.000053,-70.630861<\/p>\n<h3>Francisco<\/h3>\n<div>\n<p><strong>Operations address<\/strong>: Ruta H-155<\/p>\n<p><strong>Installed Capacity<\/strong>: 3 MW<\/p>\n<p><strong>Generation:<\/strong> Solar<\/p>\n<\/div>\n<\/li>\n<li>\n<p>-33.964139,-70.640156<\/p>\n<h3>Homero<\/h3>\n<div>\n<p><strong>Operations address<\/strong>: Ruta H-155<\/p>\n<p><strong>Installed Capacity<\/strong>: 3 MW<\/p>\n<p><strong>Generation:<\/strong> Solar<\/p>\n<\/div>\n<\/li>\n<li>\n<p>-33.984892,-70.673644<\/p>\n<h3>Mostazal<\/h3>\n<div>\n<p><strong>Operations address<\/strong>: Ruta H-111<\/p>\n<p><strong>Installed Capacity<\/strong>: 9 MW<\/p>\n<p><strong>Generation:<\/strong> Solar<\/p>\n<\/div>\n<\/li>\n<li>\n<p>-33.994611,-70.631872<\/p>\n<h3>Luders<\/h3>\n<div>\n<p><strong>Operations address<\/strong>: Ruta H-155<\/p>\n<p><strong>Installed Capacity<\/strong>: 3 MW<\/p>\n<p><strong>Generation:<\/strong> Wind<\/p>\n<\/div>\n<\/li>\n<li>\n<p>-37.748394,-73.564567<\/p>\n<h3>Raki<\/h3>\n<div>\n<p><strong>Operations address:<\/strong> Reserva Cora 38, Colhue, Lebu\/Biob\u00edo.<\/p>\n<p><strong>Installed Capacity:<\/strong> 9 MW<\/p>\n<p><strong>Generation:<\/strong> Wind<strong><br \/><\/strong><\/p>\n<\/div>\n<\/li>\n<li>\n<p>-37.7401419,-73.6994923<\/p>\n<h3>Huajache<\/h3>\n<div>\n<p><strong>Operations address:<\/strong> Reserva Cora 38, Colhue, Lebu\/Biob\u00edo.<\/p>\n<p><strong>Installed Capacity:<\/strong> 6 MW<\/p>\n<p><strong>Generation:<\/strong> Wind<\/p>\n<\/div>\n<\/li>\n<li>\n<p>24.1267,-102.0410<\/p>\n<h3>Mexico<\/h3>\n<div>\n<p>Calle 10 210, Col. Granjas San Antonio, Del, Iztapalapa, 09070 CDMX, Mexico<\/p>\n<\/div>\n<\/li>\n<li>\n<p>-34.321496154541755,-57.35507022385234<\/p>\n<h3>PE Rosario<\/h3>\n<div>\n<p><strong>Operations address<\/strong>: PE Rosario, Departamento de Colonia, Uruguay.<\/p>\n<p><strong>Installed Capacity<\/strong>: 10 MW<\/p>\n<p><strong>Generation:<\/strong>: Wind<\/p>\n<\/div>\n<\/li>\n<li>\n<p>-34.38295939008006,-56.59221564342761<\/p>\n<h3>PE Villa Rodr\u00edguez<\/h3>\n<div>\n<p><strong>Operations address<\/strong>: PE Villa Rodr\u00edguez, Departamento de San Jos\u00e9, Uruguay.<\/p>\n<p><strong>Installed Capacity<\/strong>: 10 MW<\/p>\n<p><strong>Generation:<\/strong>: Wind<\/p>\n<\/div>\n<\/li>\n<li>\n<p>-34.29848439042872,-56.53631206062818<\/p>\n<h3>PE Mar\u00eda Luz<\/h3>\n<div>\n<p><strong>Operations address:<\/strong> PE Mar\u00eda Luz, Departamento de San Jos\u00e9, Uruguay.<\/p>\n<p><strong>Installed Capacity:<\/strong> 10 MW<\/p>\n<p><strong>Generation:<\/strong> Wind<\/p>\n<\/div>\n<\/li>\n<\/ul>\n<p><!--more--><br \/>\n<!-- {\"type\":\"layout\",\"children\":[{\"type\":\"section\",\"props\":{\"animation\":\"slide-bottom-small\",\"animation_delay\":\"200\",\"image\":\"wp-content\\\/uploads\\\/2023\\\/04\\\/transparente.png\",\"image_position\":\"center-center\",\"image_size\":\"cover\",\"media_background\":\"#00582A\",\"padding\":\"small\",\"padding_remove_bottom\":false,\"style\":\"primary\",\"title_breakpoint\":\"xl\",\"title_position\":\"top-left\",\"title_rotation\":\"left\",\"vertical_align\":\"\",\"width\":\"large\"},\"children\":[{\"type\":\"row\",\"children\":[{\"type\":\"column\",\"props\":{\"image_position\":\"center-center\",\"position_sticky_breakpoint\":\"m\"},\"children\":[{\"type\":\"image\",\"props\":{\"image\":\"wp-content\\\/uploads\\\/2023\\\/07\\\/iconos-new-01w.svg\",\"image_svg_color\":\"emphasis\",\"image_width\":\"60\",\"margin\":\"default\",\"margin_remove_bottom\":true,\"text_align\":\"center\"}},{\"type\":\"headline\",\"props\":{\"content\":\"D\\u00f3nde estamos<br class=\\\"uk-visible@s\\\">\",\"margin\":\"default\",\"margin_remove_top\":true,\"position\":\"relative\",\"position_z_index\":\"1\",\"text_align\":\"center\",\"title_element\":\"h1\",\"title_style\":\"heading-medium\"}},{\"type\":\"text\",\"props\":{\"block_align\":\"center\",\"column_breakpoint\":\"m\",\"content\":\"\n\n<p>Durante m\\u00e1s de treinta a\\u00f1os, InterEnergy ha impulsado a las personas y ciudades en el Caribe y Am\\u00e9rica Latina, brindando energ\\u00eda confiable, rentable y limpia, y ha implementado la plataforma m\\u00e1s sofisticada para estaciones de carga de veh\\u00edculos el\\u00e9ctricos en el Caribe y Am\\u00e9rica Latina.<\\\/p>\\n\",\"margin\":\"\",\"maxwidth\":\"2xlarge\",\"position\":\"relative\",\"position_z_index\":\"1\",\"text_align\":\"center\",\"text_style\":\"large\"}},{\"type\":\"divider\",\"props\":{\"divider_element\":\"hr\"}},{\"type\":\"headline\",\"props\":{\"content\":\"<img src=\\\"https:\\\/\\\/interenergy.com\\\/wp-content\\\/uploads\\\/2023\\\/04\\\/pin-15.svg\\\" alt=\\\"\\\" class=\\\"alignnone wp-image-1885\\\" width=\\\"40\\\" height=\\\"40\\\" \\\/> Oficinas &nbsp;&nbsp;<img src=\\\"https:\\\/\\\/interenergy.com\\\/wp-content\\\/uploads\\\/2023\\\/04\\\/pin-13.svg\\\" alt=\\\"\\\" class=\\\"alignnone wp-image-1885\\\" width=\\\"40\\\" height=\\\"40\\\" \\\/> Operaciones\",\"text_align\":\"center\",\"title_element\":\"h2\",\"title_style\":\"h2\"}}]}]}],\"name\":\"Hero\"},{\"type\":\"section\",\"props\":{\"height\":\"pixels\",\"height_viewport\":500,\"image_position\":\"center-center\",\"padding\":\"none\",\"padding_remove_bottom\":true,\"padding_remove_top\":true,\"style\":\"default\",\"title_breakpoint\":\"xl\",\"title_position\":\"top-left\",\"title_rotation\":\"left\",\"vertical_align\":\"\",\"width\":\"\"},\"children\":[{\"type\":\"row\",\"children\":[{\"type\":\"column\",\"props\":{\"image_position\":\"center-center\",\"position_sticky_breakpoint\":\"m\"},\"children\":[{\"type\":\"map\",\"props\":{\"clustering\":false,\"content_margin\":\"small\",\"controls\":true,\"dragging\":true,\"height\":500,\"image_svg_color\":\"emphasis\",\"link_style\":\"default\",\"link_text\":\"Read more\",\"margin\":\"default\",\"marker_icon_width\":\"20px\",\"max_zoom\":18,\"meta_align\":\"below-title\",\"meta_element\":\"div\",\"meta_margin\":\"small\",\"meta_style\":\"text-meta\",\"min_zoom\":\"4\",\"poi\":false,\"show_content\":true,\"show_image\":true,\"show_link\":true,\"show_meta\":true,\"show_title\":true,\"styler_gamma\":\"2\",\"styler_saturation\":\"-100\",\"title_element\":\"h3\",\"title_hover_style\":\"reset\",\"title_margin\":\"small\",\"type\":\"roadmap\",\"viewport_height\":\"viewport\",\"viewport_height_offset_top\":false,\"width\":\"1000\",\"width_breakpoint\":true,\"zoom\":\"5\",\"zooming\":true},\"children\":[{\"type\":\"map_item\",\"props\":{\"content\":\"\n\n<p><strong>Address<\\\/strong>: <span>BMR WIND, Jamaica<\\\/span>, <span>USVI<\\\/span><br \\\/><strong>Installed Capacity<\\\/strong>: 36.3 MW<strong><br \\\/><\\\/strong><strong>Generation:<\\\/strong> Solar<\\\/p>\",\"location\":\"17.940206,-77.692292\",\"marker_icon\":\"wp-content\\\/uploads\\\/2023\\\/04\\\/pin-10.svg\",\"marker_icon_height\":40,\"marker_icon_width\":40,\"title\":\"BMR WIND\"}},{\"type\":\"map_item\",\"props\":{\"content\":\"\n\n<p><strong>Address<\\\/strong>: <span>DONOE (St.Thomas), USVI<\\\/span>, <span>Cayman<\\\/span><br \\\/><strong>Installed Capacity<\\\/strong>: 4.8 MW<strong><br \\\/><\\\/strong><strong>Generation:<\\\/strong> Solar<\\\/p>\",\"location\":\"18.342849,-64.900833\",\"marker_icon\":\"wp-content\\\/uploads\\\/2023\\\/04\\\/pin-10.svg\",\"marker_icon_height\":40,\"marker_icon_width\":40,\"title\":\"DONOE (St.Thomas)\"}},{\"type\":\"map_item\",\"props\":{\"content\":\"\n\n<p><strong>Address<\\\/strong>: <span>BODDEN TOWN<\\\/span>, <span>Cayman<\\\/span><br \\\/><strong>Installed Capacity<\\\/strong>: 5.1 MW<strong><br \\\/><\\\/strong><strong>Generation:<\\\/strong> Solar<\\\/p>\",\"location\":\"19.290172,-81.245472\",\"marker_icon\":\"wp-content\\\/uploads\\\/2023\\\/04\\\/pin-10.svg\",\"marker_icon_height\":\"40\",\"marker_icon_width\":\"40\",\"title\":\"BODDEN TOWN\"}},{\"type\":\"map_item\",\"props\":{\"content\":\"\n\n<p><strong>Address<\\\/strong>: <span>SPANISH TOWN (St. Croix)<\\\/span>, <span>USVI<\\\/span><br \\\/><strong>Installed Capacity<\\\/strong>: 5.1 MW<strong><br \\\/><\\\/strong><strong>Generation:<\\\/strong> Solar<\\\/p>\",\"location\":\"17.717992,-64.775375\",\"marker_icon\":\"wp-content\\\/uploads\\\/2023\\\/04\\\/pin-10.svg\",\"marker_icon_height\":\"40\",\"marker_icon_width\":\"40\",\"title\":\"SPANISH TOWN (St. Croix)\"}},{\"type\":\"map_item\",\"props\":{\"content\":\"\n\n<p><strong>Address<\\\/strong>: SIBO Guatemala<br \\\/><strong>Installed Capacity<\\\/strong>: 5.8 MW<strong><br \\\/><\\\/strong><strong>Generation:<\\\/strong> Solar<\\\/p>\",\"location\":\"14.975263840535332,-89.65056135581942\",\"marker_icon\":\"wp-content\\\/uploads\\\/2023\\\/04\\\/pin-10.svg\",\"marker_icon_height\":\"40\",\"marker_icon_width\":\"40\",\"title\":\"SIBO Solar Plant\"}},{\"type\":\"map_item\",\"props\":{\"content\":\"\n\n<p><strong>Address:<\\\/strong> Obarrio, 58 East Street, Plaza 58 Building, 9th Floor<\\\/p>\",\"location\":\"8.986305721888474,-79.5179140696206\",\"marker_icon\":\"wp-content\\\/uploads\\\/2023\\\/04\\\/pin-09.svg\",\"marker_icon_height\":\"40px\",\"marker_icon_width\":\"40px\",\"title\":\"Panama Office\"}},{\"type\":\"map_item\",\"props\":{\"content\":\"\n\n<p><strong>Office\\u2019s address<\\\/strong>: Ave. Abraham Lincoln 295, Edif. Caribalico, 3rd floor, La Julia, Sto. Dgo, D.N.<\\\/p>\",\"location\":\"18.4596405,-69.9287329\",\"marker_icon\":\"wp-content\\\/uploads\\\/2023\\\/04\\\/pin-09.svg\",\"marker_icon_height\":\"40\",\"marker_icon_width\":\"40\",\"title\":\"CEPM & Energas\"}},{\"type\":\"map_item\",\"props\":{\"content\":\"\n\n<p><strong>Office\\u2019s address<\\\/strong>: Kennedy 4700, Of. 901. Patio Kennedy Building, Vitacura, Santiago 7630454, Chile<\\\/p>\\n\n\n<p><strong>Installed Capacity<\\\/strong>: 45MW<\\\/p>\\n\n\n<p><strong>Generation:<\\\/strong> Solar<\\\/p>\",\"location\":\"-33.4026068,-70.5860826\",\"marker_icon\":\"wp-content\\\/uploads\\\/2023\\\/04\\\/pin-09.svg\",\"marker_icon_height\":\"40\",\"marker_icon_width\":\"40\",\"title\":\"Solar Chile\"}},{\"type\":\"map_item\",\"props\":{\"content\":\"\n\n<p><strong>Operations address<\\\/strong>: Juancho, Pedernales Province.<\\\/p>\\n\n\n<p><strong>Installed Capacity<\\\/strong>: 8.25 MW<\\\/p>\\n\n\n<p><strong>Generation:<\\\/strong>: Wind<\\\/p>\",\"location\":\"17.864887,-71.304187\",\"marker_icon\":\"wp-content\\\/uploads\\\/2023\\\/04\\\/pin-10.svg\",\"marker_icon_height\":\"40\",\"marker_icon_width\":\"40\",\"title\":\"Quilvio Cabrera\"}},{\"type\":\"map_item\",\"props\":{\"content\":\"\n\n<p><strong>Operations address<\\\/strong>: Sabana Buey, Peravia Province.<\\\/p>\\n\n\n<p><strong>Installed Capacity<\\\/strong>: 34MW expandable to 50MW<\\\/p>\\n\n\n<p><strong>Generation: <\\\/strong>Wind<\\\/p>\",\"location\":\"18.264439601552752,-70.49089168729525\",\"marker_icon\":\"wp-content\\\/uploads\\\/2023\\\/04\\\/pin-10.svg\",\"marker_icon_height\":\"40\",\"marker_icon_width\":\"40\",\"title\":\"GEDOM\"}},{\"type\":\"map_item\",\"props\":{\"content\":\"\n\n<p><strong>Operations address<\\\/strong>: San Pedro de Macor\\u00eds Province, 21000.<\\\/p>\\n\n\n<p><strong>Office\\u2019s address<\\\/strong>: Ave. Abraham Lincoln 295, Edif. Caribalico, 3rd floor, La Julia, Sto. Dgo, D.N.<\\\/p>\\n\n\n<p><strong>Installed Capacity<\\\/strong>: 300 MW<\\\/p>\\n\n\n<p><strong>Generation<\\\/strong>: Combined-cycle Natural Gas<\\\/p>\",\"location\":\"18.6109199,-69.4645029\",\"marker_icon\":\"wp-content\\\/uploads\\\/2023\\\/04\\\/pin-10.svg\",\"marker_icon_height\":\"40\",\"marker_icon_width\":\"40\",\"title\":\"Energas\"}},{\"type\":\"map_item\",\"props\":{\"content\":\"\n\n<p><strong>Operations address:<\\\/strong> East Tourist Boulevard, Bavaro, La Altagracia Province, R. D.<\\\/p>\\n\n\n<p><strong>Installed Capacity:<\\\/strong> 315MW<\\\/p>\\n\n\n<p><strong>HFO\\\/Natural gas\\\/Thermal\\\/Solar<\\\/strong><\\\/p>\\n\n\n<p><strong>Generation:<\\\/strong> Mixed (gas, solar, wind and HFO)<\\\/p>\",\"location\":\"18.66387936293568,-68.43344185981745\",\"marker_icon\":\"wp-content\\\/uploads\\\/2023\\\/04\\\/pin-10.svg\",\"marker_icon_height\":\"40\",\"marker_icon_width\":\"40\",\"title\":\"CEPM\"}},{\"type\":\"map_item\",\"props\":{\"content\":\"\n\n<p><strong>Address<\\\/strong>: Old Harbour Bay, St. Catherine, Jamaica, W.I.<br \\\/><strong>Installed Capacity<\\\/strong>: 124 MW<br \\\/><strong>HFO<br \\\/><\\\/strong><strong>Generation:<\\\/strong> Standalone electric utility<\\\/p>\",\"image\":\"wp-content\\\/uploads\\\/2023\\\/04\\\/galeria-jamaica_0004_Layer-2.jpg\",\"location\":\"17.896750,-77.106209\",\"marker_icon\":\"wp-content\\\/uploads\\\/2023\\\/04\\\/pin-10.svg\",\"marker_icon_height\":\"40\",\"marker_icon_width\":\"40\",\"title\":\"Doctor Bird Power Station (DBPS)\"}},{\"type\":\"map_item\",\"props\":{\"content\":\"\n\n<p><strong>Address:<\\\/strong> Wikip Place, Marcus Garvey Drive, Kingston, Jamaica, W.I.<\\\/p>\\n\n\n<p><strong>Installed Capacity:<\\\/strong> 65.5 MW<\\\/p>\\n\n\n<p><strong>HFO<\\\/strong><\\\/p>\\n\n\n<p><strong>Generation:<\\\/strong> Standalone electric utility<\\\/p>\",\"image\":\"wp-content\\\/uploads\\\/2023\\\/04\\\/galeria-jamaica_0001_Layer-5.jpg\",\"location\":\"17.972404,-76.805678\",\"marker_icon\":\"wp-content\\\/uploads\\\/2023\\\/04\\\/pin-10.svg\",\"marker_icon_height\":\"40\",\"marker_icon_width\":\"40\",\"title\":\"West Kingston Power Partners (WKPP) and Jamaica Energy Partners Group HQ (JEP)\"}},{\"type\":\"map_item\",\"props\":{\"content\":\"\n\n<p><strong>Address:<\\\/strong> 100 Windward Road, Kingston 2, Jamaica, W.I., Post Office Box 8259 (C.S.O.)<br \\\/><strong>Installed Capacity:<\\\/strong> 60 MW<br \\\/><strong>HFO<br \\\/><\\\/strong><strong>Generation:<\\\/strong> Standalone electric utility<\\\/p>\",\"image\":\"wp-content\\\/uploads\\\/2023\\\/04\\\/galeria-jamaica_0003_Layer-3.jpg\",\"location\":\"17.972404,-76.805678\",\"marker_icon\":\"wp-content\\\/uploads\\\/2023\\\/04\\\/pin-10.svg\",\"marker_icon_height\":\"40\",\"marker_icon_width\":\"40\",\"title\":\"Jamaica Private Power Company (JPPC)\"}},{\"type\":\"map_item\",\"props\":{\"content\":\"\n\n<p><strong>Operation address:<\\\/strong> E\\u00f3lico Penonom\\u00e9 Project, Penonom\\u00e9<br \\\/>(Cocl\\u00e9 Province)<\\\/p>\\n\n\n<p><strong>Installed Capacity:<\\\/strong> 215 MW<\\\/p>\\n\n\n<p><strong>Generation: <\\\/strong>Wind<\\\/p>\",\"location\":\"8.1680,-80.5408\",\"marker_icon\":\"wp-content\\\/uploads\\\/2023\\\/04\\\/pin-10.svg\",\"marker_icon_height\":\"40\",\"marker_icon_width\":\"40\",\"title\":\"Laudato S\\u00ed\"}},{\"type\":\"map_item\",\"props\":{\"content\":\"\n\n<p><strong>Operations address:<\\\/strong> Finca Hicaco in David (Chiriqu\\u00ed Province)<\\\/p>\\n\n\n<p><strong>Installed Capacity:<\\\/strong> 40MW<\\\/p>\\n\n\n<p><strong>Generation:<\\\/strong> Solar<\\\/p>\",\"location\":\"8.376652,-82.345875\",\"marker_icon\":\"wp-content\\\/uploads\\\/2023\\\/04\\\/pin-10.svg\",\"marker_icon_height\":\"40\",\"marker_icon_width\":\"40\",\"title\":\"Ikakos (Tecnisol)\"}},{\"type\":\"map_item\",\"props\":{\"content\":\"\n\n<p><strong>Operations address:<\\\/strong> Telfers Island, Crist\\u00f3bal (Col\\u00f3n Province)<\\\/p>\\n\n\n<p><strong>Capacity in Development: <\\\/strong>670 MW<strong><br \\\/><\\\/strong><\\\/p>\\n\n\n<p><strong>Generation: <\\\/strong>Natural gas<\\\/p>\",\"location\":\"9.328376,-79.907764\",\"marker_icon\":\"wp-content\\\/uploads\\\/2023\\\/04\\\/pin-10.svg\",\"marker_icon_height\":\"40\",\"marker_icon_width\":\"40\",\"title\":\"Gat\\u00fan\"}},{\"type\":\"map_item\",\"props\":{\"content\":\"\n\n<p><strong>Operations address:<\\\/strong> Jos\\u00e9 Agust\\u00edn Arango Ave., on corner with Interamericana Road, Pacora (Panama Province)<\\\/p>\\n\n\n<p><strong>Installed Capacity:<\\\/strong> 55MW<\\\/p>\\n\n\n<p><strong>HFO \\\/ Thermal<\\\/strong><\\\/p>\\n\n\n<p><strong>Generation:<\\\/strong> Standalone electric utility<\\\/p>\",\"location\":\"9.105058,-79.272680\",\"marker_icon\":\"wp-content\\\/uploads\\\/2023\\\/04\\\/pin-10.svg\",\"marker_icon_height\":\"40\",\"marker_icon_width\":\"40\",\"status\":\"disabled\",\"title\":\"Pedregal Power\"}},{\"type\":\"map_item\",\"props\":{\"content\":\"\n\n<p><strong>Operations address:<\\\/strong> Camino D-489 \\u2013 P.K. 4,200<\\\/p>\\n\n\n<p><strong>Installed Capacity:<\\\/strong> 2.95 MW<\\\/p>\\n\n\n<p><strong>Generation:<\\\/strong> Solar<\\\/p>\",\"location\":\"-30.507217,-71.111958\",\"marker_icon\":\"wp-content\\\/uploads\\\/2023\\\/04\\\/pin-10.svg\",\"marker_icon_height\":\"40\",\"marker_icon_width\":\"40\",\"title\":\"El Olivo\"}},{\"type\":\"map_item\",\"props\":{\"content\":\"\n\n<p><strong>Operations address:<\\\/strong> Camino D-525 \\u2013 P.K. 3,500<\\\/p>\\n\n\n<p><strong>Installed Capacity:<\\\/strong> 6 MW<\\\/p>\\n\n\n<p><strong>Generation:<\\\/strong> Solar<\\\/p>\",\"location\":\"-30.554872,-71.238839\",\"marker_icon\":\"wp-content\\\/uploads\\\/2023\\\/04\\\/pin-10.svg\",\"marker_icon_height\":\"40\",\"marker_icon_width\":\"40\",\"title\":\"Alturas de Ovalle\"}},{\"type\":\"map_item\",\"props\":{\"content\":\"\n\n<p><strong>Operations address:<\\\/strong> Ruta E-35<\\\/p>\\n\n\n<p><strong>Installed Capacity:<\\\/strong> 3 MW<\\\/p>\\n\n\n<p><strong>Generation:<\\\/strong> Solar<\\\/p>\",\"location\":\"-30.554872,-71.238839\",\"marker_icon\":\"wp-content\\\/uploads\\\/2023\\\/04\\\/pin-10.svg\",\"marker_icon_height\":\"40\",\"marker_icon_width\":\"40\",\"title\":\"Cabilsol\"}},{\"type\":\"map_item\",\"props\":{\"content\":\"\n\n<p><strong>Operations address:<\\\/strong> Ruta CH60<\\\/p>\\n\n\n<p><strong>Installed Capacity:<\\\/strong> 6 MW<\\\/p>\\n\n\n<p><strong>Generation:<\\\/strong> Solar<\\\/p>\",\"location\":\"-32.777144,-70.813306\",\"marker_icon\":\"wp-content\\\/uploads\\\/2023\\\/04\\\/pin-10.svg\",\"marker_icon_height\":\"40\",\"marker_icon_width\":\"40\",\"title\":\"Panquehue\"}},{\"type\":\"map_item\",\"props\":{\"content\":\"\n\n<p><strong>Operations address:<\\\/strong> Ruta I-85-J<\\\/p>\\n\n\n<p><strong>Installed Capacity:<\\\/strong> 2.995 MW<\\\/p>\\n\n\n<p><strong>Generation:<\\\/strong> Solar<\\\/p>\",\"location\":\"-32.777144,-70.813306\",\"marker_icon\":\"wp-content\\\/uploads\\\/2023\\\/04\\\/pin-10.svg\",\"marker_icon_height\":\"40\",\"marker_icon_width\":\"40\",\"title\":\"Chimbarongo\"}},{\"type\":\"map_item\",\"props\":{\"content\":\"\n\n<p><strong>Operations address:<\\\/strong> Ruta H-790<\\\/p>\\n\n\n<p><strong>Installed Capacity:<\\\/strong> 3 MW<\\\/p>\\n\n\n<p><strong>Generation:<\\\/strong> Solar<\\\/p>\",\"location\":\"-34.264753,-71.385908\",\"marker_icon\":\"wp-content\\\/uploads\\\/2023\\\/04\\\/pin-10.svg\",\"marker_icon_height\":\"40\",\"marker_icon_width\":\"40\",\"title\":\"Don Eugenio\"}},{\"type\":\"map_item\",\"props\":{\"content\":\"\n\n<p><strong>Operations address:<\\\/strong> Ruta 66 \\u2013 P.K. 1,100<\\\/p>\\n\n\n<p><strong>Installed Capacity:<\\\/strong> 3 MW<\\\/p>\\n\n\n<p><strong>Generation:<\\\/strong> Solar<\\\/p>\",\"location\":\"-33.902094,-71.441364\",\"marker_icon\":\"wp-content\\\/uploads\\\/2023\\\/04\\\/pin-10.svg\",\"marker_icon_height\":\"40\",\"marker_icon_width\":\"40\",\"title\":\"San Pedro\"}},{\"type\":\"map_item\",\"props\":{\"content\":\"\n\n<p><strong>Operations address<\\\/strong>: Ruta H-155<\\\/p>\\n\n\n<p><strong>Installed Capacity<\\\/strong>: 3 MW<\\\/p>\\n\n\n<p><strong>Generation:<\\\/strong> Solar<\\\/p>\",\"location\":\"-34.000053,-70.630861\",\"marker_icon\":\"wp-content\\\/uploads\\\/2023\\\/04\\\/pin-10.svg\",\"marker_icon_height\":\"40\",\"marker_icon_width\":\"40\",\"title\":\"Francisco\"}},{\"type\":\"map_item\",\"props\":{\"content\":\"\n\n<p><strong>Operations address<\\\/strong>: Ruta H-155<\\\/p>\\n\n\n<p><strong>Installed Capacity<\\\/strong>: 3 MW<\\\/p>\\n\n\n<p><strong>Generation:<\\\/strong> Solar<\\\/p>\",\"location\":\"-33.964139,-70.640156\",\"marker_icon\":\"wp-content\\\/uploads\\\/2023\\\/04\\\/pin-10.svg\",\"marker_icon_height\":\"40\",\"marker_icon_width\":\"40\",\"title\":\"Homero\"}},{\"type\":\"map_item\",\"props\":{\"content\":\"\n\n<p><strong>Operations address<\\\/strong>: Ruta H-111<\\\/p>\\n\n\n<p><strong>Installed Capacity<\\\/strong>: 9 MW<\\\/p>\\n\n\n<p><strong>Generation:<\\\/strong> Solar<\\\/p>\",\"location\":\"-33.984892,-70.673644\",\"marker_icon\":\"wp-content\\\/uploads\\\/2023\\\/04\\\/pin-10.svg\",\"marker_icon_height\":\"40\",\"marker_icon_width\":\"40\",\"title\":\"Mostazal\"}},{\"type\":\"map_item\",\"props\":{\"content\":\"\n\n<p><strong>Operations address<\\\/strong>: Ruta H-155<\\\/p>\\n\n\n<p><strong>Installed Capacity<\\\/strong>: 3 MW<\\\/p>\\n\n\n<p><strong>Generation:<\\\/strong> Wind<\\\/p>\",\"location\":\"-33.994611,-70.631872\",\"marker_icon\":\"wp-content\\\/uploads\\\/2023\\\/04\\\/pin-10.svg\",\"marker_icon_height\":\"40\",\"marker_icon_width\":\"40\",\"title\":\"Luders\"}},{\"type\":\"map_item\",\"props\":{\"content\":\"\n\n<p><strong>Operations address:<\\\/strong> Reserva Cora 38, Colhue, Lebu\\\/Biob\\u00edo.<\\\/p>\\n\n\n<p><strong>Installed Capacity:<\\\/strong> 9 MW<\\\/p>\\n\n\n<p><strong>Generation:<\\\/strong> Wind<strong><br \\\/><\\\/strong><\\\/p>\",\"location\":\"-37.748394,-73.564567\",\"marker_icon\":\"wp-content\\\/uploads\\\/2023\\\/04\\\/pin-10.svg\",\"marker_icon_height\":\"40\",\"marker_icon_width\":\"40\",\"title\":\"Raki\"}},{\"type\":\"map_item\",\"props\":{\"content\":\"\n\n<p><strong>Operations address:<\\\/strong> Reserva Cora 38, Colhue, Lebu\\\/Biob\\u00edo.<\\\/p>\\n\n\n<p><strong>Installed Capacity:<\\\/strong> 6 MW<\\\/p>\\n\n\n<p><strong>Generation:<\\\/strong> Wind<\\\/p>\",\"location\":\"-37.7401419,-73.6994923\",\"marker_icon\":\"wp-content\\\/uploads\\\/2023\\\/04\\\/pin-10.svg\",\"marker_icon_height\":\"40\",\"marker_icon_width\":\"40\",\"title\":\"Huajache\"}},{\"type\":\"map_item\",\"props\":{\"content\":\"\n\n<p>Calle 10 210, Col. Granjas San Antonio, Del, Iztapalapa, 09070 CDMX, Mexico<\\\/p>\",\"location\":\"24.1267,-102.0410\",\"marker_icon\":\"wp-content\\\/uploads\\\/2023\\\/04\\\/pin-09.svg\",\"marker_icon_height\":\"40\",\"marker_icon_width\":\"40\",\"title\":\"Mexico\"}},{\"type\":\"map_item\",\"props\":{\"content\":\"\n\n<p><strong>Operations address<\\\/strong>: PE Rosario, Departamento de Colonia, Uruguay.<\\\/p>\\n\n\n<p><strong>Installed Capacity<\\\/strong>: 10 MW<\\\/p>\\n\n\n<p><strong>Generation:<\\\/strong>: Wind<\\\/p>\",\"location\":\"-34.321496154541755,-57.35507022385234\",\"marker_icon\":\"wp-content\\\/uploads\\\/2023\\\/04\\\/pin-10.svg\",\"marker_icon_height\":\"40\",\"marker_icon_width\":\"40\",\"title\":\"PE Rosario\"}},{\"type\":\"map_item\",\"props\":{\"content\":\"\n\n<p><strong>Operations address<\\\/strong>: PE Villa Rodr\\u00edguez, Departamento de San Jos\\u00e9, Uruguay.<\\\/p>\\n\n\n<p><strong>Installed Capacity<\\\/strong>: 10 MW<\\\/p>\\n\n\n<p><strong>Generation:<\\\/strong>: Wind<\\\/p>\",\"location\":\"-34.38295939008006,-56.59221564342761\",\"marker_icon\":\"wp-content\\\/uploads\\\/2023\\\/04\\\/pin-10.svg\",\"marker_icon_height\":\"40\",\"marker_icon_width\":\"40\",\"title\":\"PE Villa Rodr\\u00edguez\"}},{\"type\":\"map_item\",\"props\":{\"content\":\"\n\n<p><strong>Operations address:<\\\/strong> PE Mar\\u00eda Luz, Departamento de San Jos\\u00e9, Uruguay.<\\\/p>\\n\n\n<p><strong>Installed Capacity:<\\\/strong> 10 MW<\\\/p>\\n\n\n<p><strong>Generation:<\\\/strong> Wind<\\\/p>\",\"location\":\"-34.29848439042872,-56.53631206062818\",\"marker_icon\":\"wp-content\\\/uploads\\\/2023\\\/04\\\/pin-10.svg\",\"marker_icon_height\":\"40\",\"marker_icon_width\":\"40\",\"title\":\"PE Mar\\u00eda Luz\"}}],\"name\":\"Map desktop\"},{\"type\":\"html\",\"props\":{\"content\":\"[wpgmza id=\\\"1\\\"]\",\"status\":\"disabled\"}}]}],\"props\":{\"column_gap\":\"collapse\",\"margin\":\"remove-vertical\",\"margin_remove_bottom\":true,\"margin_remove_top\":true,\"row_gap\":\"collapse\"}}]}],\"version\":\"4.5.24\"} --><\/p>\n","protected":false},"excerpt":{"rendered":"<p>D\u00f3nde estamos Durante m\u00e1s de treinta a\u00f1os, InterEnergy ha impulsado a las personas y ciudades en el Caribe y Am\u00e9rica Latina, brindando energ\u00eda confiable, rentable y limpia, y ha implementado la plataforma m\u00e1s sofisticada para estaciones de carga de veh\u00edculos el\u00e9ctricos en el Caribe y Am\u00e9rica Latina. Oficinas &nbsp;&nbsp; Operaciones 17.940206,-77.692292 BMR WIND Address: BMR [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":10,"comment_status":"open","ping_status":"open","template":"","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-10792","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>D\u00f3nde estamos - InterEnergy<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/interenergy.com\/es\/donde-estamos\/\" \/>\n<meta property=\"og:locale\" content=\"es_ES\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"D\u00f3nde estamos - InterEnergy\" \/>\n<meta property=\"og:description\" content=\"D\u00f3nde estamos Durante m\u00e1s de treinta a\u00f1os, InterEnergy ha impulsado a las personas y ciudades en el Caribe y Am\u00e9rica Latina, brindando energ\u00eda confiable, rentable y limpia, y ha implementado la plataforma m\u00e1s sofisticada para estaciones de carga de veh\u00edculos el\u00e9ctricos en el Caribe y Am\u00e9rica Latina. Oficinas &nbsp;&nbsp; Operaciones 17.940206,-77.692292 BMR WIND Address: BMR [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/interenergy.com\/es\/donde-estamos\/\" \/>\n<meta property=\"og:site_name\" content=\"InterEnergy\" \/>\n<meta property=\"article:modified_time\" content=\"2025-08-05T21:29:17+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/interenergy.com\/wp-content\/uploads\/2023\/04\/pin-15.svg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Tiempo de lectura\" \/>\n\t<meta name=\"twitter:data1\" content=\"3 minutos\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/interenergy.com\\\/es\\\/donde-estamos\\\/\",\"url\":\"https:\\\/\\\/interenergy.com\\\/es\\\/donde-estamos\\\/\",\"name\":\"D\u00f3nde estamos - InterEnergy\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/interenergy.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/interenergy.com\\\/es\\\/donde-estamos\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/interenergy.com\\\/es\\\/donde-estamos\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/interenergy.com\\\/wp-content\\\/uploads\\\/2023\\\/04\\\/pin-15.svg\",\"datePublished\":\"2021-08-03T11:32:51+00:00\",\"dateModified\":\"2025-08-05T21:29:17+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/interenergy.com\\\/es\\\/donde-estamos\\\/#breadcrumb\"},\"inLanguage\":\"es\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/interenergy.com\\\/es\\\/donde-estamos\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"es\",\"@id\":\"https:\\\/\\\/interenergy.com\\\/es\\\/donde-estamos\\\/#primaryimage\",\"url\":\"https:\\\/\\\/interenergy.com\\\/wp-content\\\/uploads\\\/2023\\\/04\\\/pin-15.svg\",\"contentUrl\":\"https:\\\/\\\/interenergy.com\\\/wp-content\\\/uploads\\\/2023\\\/04\\\/pin-15.svg\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/interenergy.com\\\/es\\\/donde-estamos\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/interenergy.com\\\/es\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"D\u00f3nde estamos\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/interenergy.com\\\/#website\",\"url\":\"https:\\\/\\\/interenergy.com\\\/\",\"name\":\"Interenergy.com\",\"description\":\"Powering Progress in the Caribbean and Latin America Since 1988\",\"publisher\":{\"@id\":\"https:\\\/\\\/interenergy.com\\\/#organization\"},\"alternateName\":\"Interenergy.com\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/interenergy.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"es\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/interenergy.com\\\/#organization\",\"name\":\"InterEnergy\",\"url\":\"https:\\\/\\\/interenergy.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"es\",\"@id\":\"https:\\\/\\\/interenergy.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/interenergy.com\\\/wp-content\\\/uploads\\\/2025\\\/04\\\/logo-interenergy-696.jpg\",\"contentUrl\":\"https:\\\/\\\/interenergy.com\\\/wp-content\\\/uploads\\\/2025\\\/04\\\/logo-interenergy-696.jpg\",\"width\":696,\"height\":696,\"caption\":\"InterEnergy\"},\"image\":{\"@id\":\"https:\\\/\\\/interenergy.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.instagram.com\\\/interenergygroup\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"D\u00f3nde estamos - InterEnergy","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/interenergy.com\/es\/donde-estamos\/","og_locale":"es_ES","og_type":"article","og_title":"D\u00f3nde estamos - InterEnergy","og_description":"D\u00f3nde estamos Durante m\u00e1s de treinta a\u00f1os, InterEnergy ha impulsado a las personas y ciudades en el Caribe y Am\u00e9rica Latina, brindando energ\u00eda confiable, rentable y limpia, y ha implementado la plataforma m\u00e1s sofisticada para estaciones de carga de veh\u00edculos el\u00e9ctricos en el Caribe y Am\u00e9rica Latina. Oficinas &nbsp;&nbsp; Operaciones 17.940206,-77.692292 BMR WIND Address: BMR [&hellip;]","og_url":"https:\/\/interenergy.com\/es\/donde-estamos\/","og_site_name":"InterEnergy","article_modified_time":"2025-08-05T21:29:17+00:00","og_image":[{"url":"https:\/\/interenergy.com\/wp-content\/uploads\/2023\/04\/pin-15.svg","type":"","width":"","height":""}],"twitter_card":"summary_large_image","twitter_misc":{"Tiempo de lectura":"3 minutos"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/interenergy.com\/es\/donde-estamos\/","url":"https:\/\/interenergy.com\/es\/donde-estamos\/","name":"D\u00f3nde estamos - InterEnergy","isPartOf":{"@id":"https:\/\/interenergy.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/interenergy.com\/es\/donde-estamos\/#primaryimage"},"image":{"@id":"https:\/\/interenergy.com\/es\/donde-estamos\/#primaryimage"},"thumbnailUrl":"https:\/\/interenergy.com\/wp-content\/uploads\/2023\/04\/pin-15.svg","datePublished":"2021-08-03T11:32:51+00:00","dateModified":"2025-08-05T21:29:17+00:00","breadcrumb":{"@id":"https:\/\/interenergy.com\/es\/donde-estamos\/#breadcrumb"},"inLanguage":"es","potentialAction":[{"@type":"ReadAction","target":["https:\/\/interenergy.com\/es\/donde-estamos\/"]}]},{"@type":"ImageObject","inLanguage":"es","@id":"https:\/\/interenergy.com\/es\/donde-estamos\/#primaryimage","url":"https:\/\/interenergy.com\/wp-content\/uploads\/2023\/04\/pin-15.svg","contentUrl":"https:\/\/interenergy.com\/wp-content\/uploads\/2023\/04\/pin-15.svg"},{"@type":"BreadcrumbList","@id":"https:\/\/interenergy.com\/es\/donde-estamos\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/interenergy.com\/es\/"},{"@type":"ListItem","position":2,"name":"D\u00f3nde estamos"}]},{"@type":"WebSite","@id":"https:\/\/interenergy.com\/#website","url":"https:\/\/interenergy.com\/","name":"Interenergy.com","description":"Powering Progress in the Caribbean and Latin America Since 1988","publisher":{"@id":"https:\/\/interenergy.com\/#organization"},"alternateName":"Interenergy.com","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/interenergy.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"es"},{"@type":"Organization","@id":"https:\/\/interenergy.com\/#organization","name":"InterEnergy","url":"https:\/\/interenergy.com\/","logo":{"@type":"ImageObject","inLanguage":"es","@id":"https:\/\/interenergy.com\/#\/schema\/logo\/image\/","url":"https:\/\/interenergy.com\/wp-content\/uploads\/2025\/04\/logo-interenergy-696.jpg","contentUrl":"https:\/\/interenergy.com\/wp-content\/uploads\/2025\/04\/logo-interenergy-696.jpg","width":696,"height":696,"caption":"InterEnergy"},"image":{"@id":"https:\/\/interenergy.com\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.instagram.com\/interenergygroup"]}]}},"_links":{"self":[{"href":"https:\/\/interenergy.com\/es\/wp-json\/wp\/v2\/pages\/10792","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/interenergy.com\/es\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/interenergy.com\/es\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/interenergy.com\/es\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/interenergy.com\/es\/wp-json\/wp\/v2\/comments?post=10792"}],"version-history":[{"count":2,"href":"https:\/\/interenergy.com\/es\/wp-json\/wp\/v2\/pages\/10792\/revisions"}],"predecessor-version":[{"id":11369,"href":"https:\/\/interenergy.com\/es\/wp-json\/wp\/v2\/pages\/10792\/revisions\/11369"}],"wp:attachment":[{"href":"https:\/\/interenergy.com\/es\/wp-json\/wp\/v2\/media?parent=10792"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}