The Raki and Huajache wind farms in Chile, which are located in the Bío Bío region and commenced commercial operations in the third quarter of 2015, have a combined total installed capacity of 15 MW (9 MW and 6 MW, respectively). The projects operate under a 10-year PPA with EKA Chile S.A, a first-class offtaker. The wind technology consists of five 3 MW Vestas V112 turbines

InterEnergy acquired 100% of the wind projects in January of 2016.

interenergy.com